How Does Pool Resurfacing Work?

Swimming pool resurfacing is one of the most important parts of any pool renovation system. The specifications & Procedures for Pool Resurfacing are as below:

  1. Draining of the pool – Any pool resurfacing contractor shall be required to drain the pool prior to starting the work and in accordance with any local, state or federal requirement, laws, codes or policies.
  2. Water Washing of the Pool – Once the pool; has been drained properly, the contractor shall wash the pool surface area removing any kind of algae, mold, mildew, dirt, paint, mortar, any kind of patching compounds, loose tile cracked plaster. Removal can easily be done by using a high pressure washing.
  3. Acid washing of pool – Once the water washing has been completed; the contractor shall complete the acid wash procedure especially for pebblecrete pool.
  4. Removal of waterline tiles – All waterline tiles around the perimeter of the pool surface shall be removed and replaced by the contractor with the same size and color of tile. Exact color samples shall be included in the bid package for the owners use in determining which tile color to use.

The average timeline for completing the process of swimming pool resurfacing thoroughly chronicling all of the steps necessary to complete one project of any pool resurfacing. We at Amazing Pool Renovations are all set to help you throughout for your pool renovation.

Contact Amazing Pool Renovations for your future booking for your pool renovations.

Leave a comment